We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

RefurbUPS

RefurbUPS Altronix AL802ULADA Compatible UPS Replacement Battery Kit 12V12A 2 Pack

SKU CH-T3TX-CAJQT

Two 12 V 12 A sealed lead-acid batteries replace the Altronix AL802ULADA cartridge in security-system UPS units

  • TypeKit/Package
  • Weight20
  • Two high-rate 12V12A SLA batteries deliver reliable backup power
  • Kit includes two matched cells for balanced performance
  • Compatible with Altronix AL802ULADA security systems
  • New condition ensures full service life from installation

Altronix AL802ULADA Compatible Battery Kit

This kit supplies two 12V12A sealed lead-acid batteries built to fit Altronix AL802ULADA security and UPS units. It is intended for installers and system owners who need a direct replacement when the original cells reach end of life.

Capacity and headroom for security backup

Each 12-ampere-hour cell delivers the rated runtime for alarm panels and small UPS loads during mains loss. The pair will not support larger server arrays or extended-duration applications that demand higher total capacity.

Highlights

  • Two high-rate 12V12A SLA batteries deliver reliable backup power
  • Kit includes two matched cells for balanced performance
  • Compatible with Altronix AL802ULADA security systems
  • New condition ensures full service life from installation

Specifications

BrandAlarm
SeriesAlarm Batteries
TypeKit/Package
Weight20

Questions about this item

Will the two 12V12A batteries in this kit fit the existing battery compartment of my Altronix AL802ULADA unit?

The kit contains two 12V12A SLA batteries built as direct replacements for the Altronix AL802ULADA, so they match the original form factor and terminal layout.

How can I verify the kit is working correctly after I install the batteries?

Power on the Altronix unit and confirm the system shows normal voltage with no low-battery fault; then run a brief self-test or simulated mains-loss to ensure the backup runtime engages cleanly.

New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.