We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

Schneider Electric

Schneider Electric SRTRK4 19" Rail Kit for Smart-UPS SRT 2.2/3 kVA

SKU CH-4QGS-YXA2A

19-inch rail kit mounts APC Smart-UPS SRT 2.2/3 kVA units in standard racks

  • 19-inch rack mounting for Smart-UPS SRT 2.2/3 kVA
  • Low-profile 1.7-inch height preserves rack space
  • 7-inch width aligns with standard 19-inch enclosures
  • 5-inch depth keeps rear clearance minimal

19-inch rail kit for Smart-UPS SRT 2.2/3 kVA

This mounting rail kit secures a compatible APC Smart-UPS SRT unit in a standard 19-inch rack enclosure. It is designed for IT administrators installing 2.2 or 3 kVA models in server rooms or network closets. The kit provides the hardware needed for a fixed rail installation. It is not suited for tower-only UPS units or racks that require sliding rails.

Thermals, noise and power draw

The rail kit is a passive mechanical accessory with no electrical components, so it generates no heat, produces no audible noise and draws no power. It does not affect the thermal performance or acoustic profile of the mounted UPS. Installation simply adds the structural framework required for rack mounting.

Highlights

  • 19-inch rack mounting for Smart-UPS SRT 2.2/3 kVA
  • Low-profile 1.7-inch height preserves rack space
  • 7-inch width aligns with standard 19-inch enclosures
  • 5-inch depth keeps rear clearance minimal

Specifications

BrandAPC SCHNEIDER ELECTRIC IT USA

Questions about this item

How do I mount the SRTRK4 rail kit in a 19" rack and which step is commonly missed?

Slide the rails into the 19" rack posts and secure them with the included screws; the step often missed is tightening both front and rear brackets before placing the UPS.

What maintenance will the rail kit need after installation?

Periodically check that all mounting screws remain tight and inspect the rails for any bending; no lubrication or part replacement is required under normal use.

New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.