RefurbUPS
RefurbUPS DS1000B 12V7A 3-battery kit
Three 12 V 7 Ah sealed lead-acid batteries replace the DS1000B UPS pack
- TypeKit/Package
- Weight18
- Compatible 12V 7A kit powers OPTI-UPS DS1000B units
- Three high-rate SLA cells deliver reliable backup runtime
- Factory-fresh batteries ensure consistent performance from day one
- 18 kg pack includes step-by-step installation instructions
- Ready-to-ship kit minimises downtime during battery swaps
What this kit is
This replacement battery kit contains three 12V7A sealed lead-acid cells built for the OptiUPS DS1000B uninterruptible power supply. It is intended for administrators or technicians who need to restore runtime on that specific UPS model. The pack arrives factory fresh with installation instructions included.
When to replace the cells
The kit replaces the original battery cartridge once its capacity has degraded and the UPS can no longer hold the required load during an outage. Swapping all three cells at once restores the designed backup time and avoids the imbalance that mixing old and new batteries creates.
Limits of the sealed lead-acid design
Sealed lead-acid chemistry self-discharges in storage and loses capacity permanently if left deeply discharged for long periods. The cells must be kept upright, charged periodically when not in use, and recycled at end of life rather than discarded with general waste.
Highlights
- Compatible 12V 7A kit powers OPTI-UPS DS1000B units
- Three high-rate SLA cells deliver reliable backup runtime
- Factory-fresh batteries ensure consistent performance from day one
- 18 kg pack includes step-by-step installation instructions
- Ready-to-ship kit minimises downtime during battery swaps
Specifications
| Brand | OptiUPS |
|---|---|
| Series | OptiUPS |
| Type | Kit/Package |
| Weight | 18 |
Questions about this item
What are the dimensions and weight of the three 12V 7A batteries in this kit?
The kit weighs 18 units in total and contains three 12V 7A sealed lead-acid batteries designed for the DS1000B UPS.
How do I install the batteries, and which step is most often missed?
Follow the included instructions to open the UPS cabinet, disconnect the old set, connect the new batteries in series, and secure the cover before powering on.
When will these 12V 7A SLA batteries need replacement?
Expect three to five years of service; replace the set when runtime drops noticeably or the UPS signals a battery fault.
New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.
RARITAN COMPUTER Dominion KX II CIM DVI Dual USB kvm cable
- Black



