CyberPower
CyberPower PDU33108 PDU 3-Phase 200-240V 50A 42 Outlets 10ft Hubbell CS8365C 0U LCD
Three-phase monitored PDU distributes 200–240 V at 35 A derated load through 36 C13 and 6 C19 outlets on a 10 ft cord with Hubbell CS8365C plug
- 3-phase power distributes load across 200-240V supply
- 42 outlets (36 C13 + 6 C19) support dense rack deployments
- Monitored PDU sends email, SMS and SNMP trap alerts
- 50A input derated to 35A for continuous safe operation
- Vertical 0U form factor with LCD saves rack space
Three-Phase Monitored PDU
The CyberPower PDU33108 is a three-phase monitored power distribution unit that operates at 200V-240V with a 50A input derated to 35A. It mounts vertically in a 0U rack footprint and provides 42 outlets in total. A 10ft cord terminates in a Hubbell CS8365C plug and an integrated LCD display shows local metering data.
High-density racks needing remote alerts
This unit suits data-centre racks that require outlet-level monitoring with email, SMS text and SNMP trap notifications. The mix of 36 IEC-320 C13 and 6 IEC-320 C19 outlets supports dense server and network gear deployments. Facilities limited to single-phase supply or lower amperage service should look at alternative power distribution units.
42-outlet count with C13/C19 mix
The single specification that decides fit is the outlet configuration of 36 C13 and 6 C19 receptacles delivering 42 connections from one vertical chassis. Match this count and connector mix to your equipment cable inventory before purchase. The 35A derated capacity and three-phase 200V-240V input must also align with your facility power.
Highlights
- 3-phase power distributes load across 200-240V supply
- 42 outlets (36 C13 + 6 C19) support dense rack deployments
- Monitored PDU sends email, SMS and SNMP trap alerts
- 50A input derated to 35A for continuous safe operation
- Vertical 0U form factor with LCD saves rack space
Specifications
No published specifications for this item yet.
Questions about this item
Are the IEC-320 C13 and C19 outlets user-replaceable if one fails?
The 36 C13 and 6 C19 outlets are fixed on the vertical chassis; failed outlets require whole-unit service rather than individual replacement.
At what sustained load does the 35 A derating become the limiting factor?
Continuous draw above 35 A on the 3-phase input triggers the derated limit before the 50 A plug rating is reached.
How much heat does the unit add to a rack when fully loaded all day?
The monitored PDU itself draws only a few watts for its LCD and network card, so nearly all heat comes from the connected equipment, not the distribution unit.
New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.



