We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

APC

APC Metered Rack PDU Zero U 30A 120V (24)5-20 AP7832

SKU CH-G1YF-CVVA1

Zero U metered PDU distributes 120 V power through twenty-four NEMA 5-20R outlets with a NEMA L5-30P input and 10-foot cord

  • TypeBasic
  • Metered monitoring tracks real-time load on 24 outlets
  • Zero-U vertical design fits 63.75-inch rack height without using U-space
  • 30 A input capacity delivers 2880 VA at 120 V
  • 10-foot cord with NEMA L5-30P plug reaches distant power sources
  • Built-in overload protection safeguards connected equipment

Metered Rack PDU 30A 120V

The APC AP7832 is a Zero U metered power distribution unit that delivers 120V output from a NEMA L5-30P input. It provides 24 NEMA 5-20R outlets and a 10-foot cord for rack mounting in server rooms and network closets. Local metering displays the aggregate load so operators can monitor power consumption at a glance.

Suits 120V racks needing outlet density.

This unit fits environments that run 100V or 120V single-phase service and require 24 outlets in a compact vertical form factor. It is not suitable for sites that need per-outlet switching, remote reboot capability, or input voltages other than 100V and 120V.

24 NEMA 5-20R outlets at 2880 VA

The single specification that determines fit is the 24 NEMA 5-20R outlets fed by a 30A 120V input with a 2880 VA load capacity. If the equipment requires a different receptacle type, a higher voltage, or switched outlet management, this PDU will not meet the requirement.

Highlights

  • Metered monitoring tracks real-time load on 24 outlets
  • Zero-U vertical design fits 63.75-inch rack height without using U-space
  • 30 A input capacity delivers 2880 VA at 120 V
  • 10-foot cord with NEMA L5-30P plug reaches distant power sources
  • Built-in overload protection safeguards connected equipment

Specifications

TypeBasic

Questions about this item

What rack height and mounting orientation does the 63.75-inch Zero U PDU require?

The unit mounts vertically in a standard 19-inch rack using its full 63.75-inch length; Zero U design means it occupies no horizontal rack units.

How do I connect the 10-foot input cord to a 30 A 120 V source, and what common wiring mistake should I avoid?

Plug the NEMA L5-30P connector into a matching 30 A receptacle; do not use an adapter that defeats the locking feature or exceed the 24 A per-phase limit.

When should I plan to replace the internal surge-protection components in this metered PDU?

APC recommends replacing the surge module after a major over-voltage event or when the front-panel indicator shows end-of-life, typically every three to five years under normal loads.

New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.