We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

APC

APC AP8962 Switched PDU 208V 3PH 20A 24x 5-20R 0U

SKU CH-R9Q7-0HFZP MPN AP8962

A switched three-phase PDU delivering 120V power through 24 NEMA 5-20R outlets with remote on/off control, power sequencing and real-time load monitoring in a 0U vertical form factor

  • TypeSwitched
  • Rack Size0U
  • CertificationscUL Listed, FCC Part 15 Class A, ICES-003, UL 60950-1, UL Li
  • ROHSYes
  • Input Voltage208V 3PH
  • Input Frequency50/60 Hz
  • Switched outlet control enables remote reboot of connected equipment
  • 24 NEMA 5-20R outlets distribute 120V power to rack devices
  • 0U vertical mounting preserves rack space for servers
  • 208V three-phase 20A input delivers 6.0 kW capacity
  • cUL and UL 60950-1 listed for safety compliance

Switched Three-Phase PDU 208V 20A

This APC AP8962 is a switched rack power distribution unit that takes a 208 V three-phase feed at 20 A through a NEMA L21-20P plug and delivers 120 V to twenty-four NEMA 5-20R outlets. It mounts vertically in a 0U form factor and provides remote on/off control, power sequencing, and real-time current metering for each outlet. Network management is available via secure Web, SNMP, or Telnet interfaces.

Suited For / Not Suited For

The unit suits data-centre racks that need outlet-level switching and load monitoring on a 208 V three-phase 20 A supply with standard North American 5-20R receptacles. It is not for sites that lack three-phase 208 V power, that require IEC-style outlets, or that need a horizontal rack-mount form factor.

Deciding Specification

The single specification that decides fit is the input connector: a NEMA L21-20P plug delivering 208 V three-phase at 20 A. If the facility provides that exact supply, the PDU can be used; otherwise a different input configuration is required.

Highlights

  • Switched outlet control enables remote reboot of connected equipment
  • 24 NEMA 5-20R outlets distribute 120V power to rack devices
  • 0U vertical mounting preserves rack space for servers
  • 208V three-phase 20A input delivers 6.0 kW capacity
  • cUL and UL 60950-1 listed for safety compliance

Specifications

BrandAPC
ModelAP8962
TypeSwitched
Rack Size0U
CertificationscUL Listed, FCC Part 15 Class A, ICES-003, UL 60950-1, UL Listed
ROHSYes
Input Voltage208V 3PH
Input Frequency50/60 Hz
Maximum Input Current20A
Input Connector(s)NEMA L21-20P
Cord Length6.0 Feet
Output Voltage120V
Output Connector(s)24 x NEMA 5-20R
Operating Environment-5 - 45 ºC
Operating Relative Humidity5 - 95%
Operating Elevation0 - 3000 m
Storage Temperature-25 - 65 ºC
Storage Relative Humidity5 - 95%
Storage Elevation0 - 15000 m
Dimensions70.50" x 2.18" x 1.72"
Weight15.33 lbs.
Shipping weight9.53 kg
Package size2000 × 165 × 108 mm

Questions about this item

Will the 20 A three-phase input trip before the 24 outlets reach full load?

The unit is rated for 20 A maximum input current on a 208 V three-phase feed; the internal branch breakers protect the 24 NEMA 5-20R outlets so sustained draw cannot exceed the 20 A supply limit.

How much heat and noise does the AP8962 add when it runs continuously in a 45 °C aisle?

The PDU has no fans and operates silently; its own dissipation is minimal, and the specified operating range tops out at 45 °C with 5–95 % humidity.

What upstream connection must the site already provide for the NEMA L21-20P plug?

A 208 V three-phase 20 A circuit terminated in a NEMA L21-20R receptacle is required; the PDU includes a 6.0 ft cord to reach it.

New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.