We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

APC

APC AP7869 Metered ZeroU PDU 14.4kW 208V 3PH

SKU CH-GMBT-ZQ7JV

Metered ZeroU PDU delivers 14.4 kW at 208 V three-phase with 13 C13, 19 C19 and 30 A NEMA L6-30R outlets

  • Metered monitoring tracks real-time load per phase
  • 4 kW three-phase capacity supports dense rack deployments
  • ZeroU vertical form factor preserves horizontal rack space
  • 13 IEC C13 and 19 IEC C19 outlets plus NEMA L6-30R cover mixed equipment needs

Metered ZeroU PDU for 14.4 kW three-phase racks

This APC AP7869 distributes 208 V three-phase power in a vertical ZeroU form factor. It provides metered monitoring for data-centre and server-room racks that require high-density power delivery without consuming horizontal rack space. The three-foot input cord connects to a Hubbell CS8365C-compatible source.

Output mix of IEC C13, IEC C19 and NEMA L6-30R

The unit supplies 208 V through a combination of IEC 320 C13, IEC 320 C19 and NEMA L6-30R receptacles. Builders needing only C13 outlets or a different plug type should select an alternative PDU.

Highlights

  • Metered monitoring tracks real-time load per phase
  • 4 kW three-phase capacity supports dense rack deployments
  • ZeroU vertical form factor preserves horizontal rack space
  • 13 IEC C13 and 19 IEC C19 outlets plus NEMA L6-30R cover mixed equipment needs

Specifications

BrandAPC
ModelAP7869

Questions about this item

What does the 14.4 kW rating mean for actual rack equipment?

It represents the maximum continuous load the unit can distribute at 208 V three-phase without tripping its internal protection.

How does the Hubbell CS8365C input connection limit deployment options?

It requires a matching 208 V three-phase receptacle rated for the same pinout, so the PDU can only be plugged into facilities wired for that specific connector.

New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.