Innovation First, Inc. 1UCMA-137 1U Cable Management Arm 19" 28.5"-33" computer accessory
- Product Type:Cable…
- Panel Width:19" Rac…
We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.
APC
Distributes 208 V three-phase power to three C19 outlets at up to 8.6 kW with a 12 ft cord
The APC AP6037A is a basic power distribution unit designed for server racks and network cabinets that need three C19 outlets from a single three-phase feed. It mounts in a 0U or 1U orientation and ships with a 12 ft NEMA L15-30P cord already attached.
The input connector is rated for 30 A but regulatory derating restricts continuous draw to 24 A across the 200 to 240 VAC range. The three-phase cord and built-in 30 A overload protection enforce that ceiling, so the unit cannot sustain loads beyond the derated figure.
At the rated voltage the PDU delivers up to 8.6 kW, enough for multiple high-density servers or storage arrays that use C19 inlets. Only three outlets are provided, so deployments needing more connections or a different outlet mix will require additional distribution units.
| Brand | Schneider Electric |
|---|---|
| Model | AP6037A |
| Type | Basic |
| Certifications | UL / C-UL |
| ROHS | 2011/65/EU - latest revision |
| Input Voltage | 200 - 240 VAC +6% to -10% |
| Input Frequency | 50/60 Hz |
| Maximum Input Current | 30A |
| Regulatory Derated Input Current | 24A |
| Input Connector(s) | NEMA L15-30P (3-phase cord included) |
| Cord Length | 12 ft |
| Output Voltage | 200 - 240 VAC +6% to -10% |
| Output Connector(s) | 3 x C19 |
| Overload Protection | 30A |
| Operating Environment | 0 - 50 Celcius degree |
| Operating Relative Humidity | 5 - 95% |
| Operating Elevation | 0 - 10000 Feet |
| Storage Temperature | -15 - 60 celcius degree |
| Storage Relative Humidity | 5 - 95% |
| Storage Elevation | 0 - 50000 Feet |
| Dimensions | 1.72" x 15.28" x 4.95" |
| Weight | 7.92 lbs. |
| Shipping weight | 8.57 kg |
| Package size | 470 × 343 × 203 mm |
The 8.6 kW rating at 208 V three-phase represents the maximum continuous load the PDU can distribute. With a regulatory derated input of 24 A, you should plan connected equipment to stay within that limit.
The NEMA L15-30P is a locking three-phase plug rated for 30 A at 200-240 VAC. Your rack or floor PDU must provide a matching L15-30R receptacle on a 30 A three-phase branch circuit.
The unit provides three IEC C19 output sockets. Each C19 can accept a C20 inlet from a server or network device, so you can directly connect up to three pieces of equipment.
New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.
Also in this aisle
Same shelf, same checkout — eight coins and a 30-minute rate lock.
What you pay in, and what you read prices in.
Sent from your wallet at checkout
Display only — the catalogue is priced in USD
No currency matches that.
Pick the language the site speaks to you in.
No language matches that.
New here?
Already have one?
There is no automatic reset: this shop sends no mail, so there is no one-time link to ask for. Leave the address on the account and it gets picked up by hand.
Request noted
Nothing is on its way to your inbox — this shop sends no mail at all. Someone picks these up by hand.
Remembered it?