Viega
Viega ProPress XL reducing tee 3 in × 3 in × 1-1/4 in 22313
Reducing tee joins 3 in and 1-1/4 in copper tubing with press-fit connections for potable water systems, rated to 200 psi
- ProPress XL press-fit connections install without open flame
- Three press-fit ends join 3 in, 3 in and 1-1/4 in copper tube
- EPDM O-rings seal potable water systems up to 200 psi
- Copper body with centre stop dimple ensures correct insertion depth
- Reducing tee design enables branch take-off in a single fitting
ProPress XL Reducing Tee 3×3×1-1/4
This copper press-fit tee connects three pipe sections in potable-water systems. Two ends accept 3-inch copper tube and the third accepts 1-1/4-inch tube. A built-in center-stop dimple ensures correct insertion depth on every joint. The fitting is rated for 200 psi maximum operating pressure.
Press-Fit Installation Replaces Soldered Tees
The press-fit design eliminates open-flame soldering, reducing fire risk and installation time on commercial and residential jobs. It upgrades from traditional sweat fittings where hot-work permits are difficult or where rapid assembly is required. The EPDM O-ring seals on each end provide leak-tight performance without flux or solder.
Three-Port Copper Distribution Fitting
The tee handles hot and cold potable water distribution at 200 psi working pressure. Its copper body resists corrosion and maintains water quality in standard plumbing layouts. The reducing branch allows a direct step-down from a 3-inch main to a 1-1/4-inch lateral without additional reducers. The 6-5/16-inch overall length fits typical commercial rough-in spacing.
Highlights
- ProPress XL press-fit connections install without open flame
- Three press-fit ends join 3 in, 3 in and 1-1/4 in copper tube
- EPDM O-rings seal potable water systems up to 200 psi
- Copper body with centre stop dimple ensures correct insertion depth
- Reducing tee design enables branch take-off in a single fitting
Specifications
| Brand | Viega |
|---|
Questions about this item
What copper tube sizes does the 3 in × 3 in × 1-1/4 in reducing tee connect?
The tee joins two 3 in copper tube ends and one 1-1/4 in copper tube end using press-fit connections on all three sides.
How is the Viega ProPress XL tee installed, and what step is often missed?
A ProPress tool presses the fitting onto clean, deburred tube until the tool completes its cycle; skipping the deburring step can damage the EPDM O-ring and cause leaks.
When should the EPDM O-rings in this reducing tee be inspected or replaced?
Inspect the O-rings during any system maintenance or if pressure testing shows a drop; replace them if they show cracking, hardening or permanent deformation.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.
Taylor Made 12" x 18" Jolly Roger Novelty Flag 1818 marine electronic
- Accessories



