Victron Energy
Victron Energy BMV-712 BLACK Smart battery monitor
A smart battery monitor with built-in Bluetooth that tracks midpoint voltage and installs via a quick-connect shunt and RJ12 cable
- ColorTransparent
- Bluetooth built-in enables wireless system monitoring
- Quick-connect shunt with RJ12 cable simplifies installation
- Midpoint voltage monitoring protects series battery banks
- 10 m RJ12 cable and 2 m fused battery cable included
- Square or round bezel options suit different panel layouts
Smart battery monitor with Bluetooth
The Victron Energy BMV-712 BLACK Smart battery monitor provides precise state-of-charge tracking for battery banks. Built-in Bluetooth enables wireless communication with other Victron Energy products for simplified system integration. It suits installers and owners who need real-time battery data on mobile devices.
Midpoint voltage monitoring for series banks
The monitor measures midpoint voltage to detect a single failing cell before it damages the entire bank. All electrical connections use a quick-connect PCB on the current shunt linked by a standard RJ12 cable. This design reduces wiring complexity during normal operation.
Included cables and mounting hardware
A 10 m RJ12 cable and a 2 m fused battery cable are supplied so no extra components are required. The package also provides a separate front bezel for square or round display appearance, a securing ring for rear mounting and screws for front mounting. These items allow flexible installation without additional purchases.
Highlights
- Bluetooth built-in enables wireless system monitoring
- Quick-connect shunt with RJ12 cable simplifies installation
- Midpoint voltage monitoring protects series battery banks
- 10 m RJ12 cable and 2 m fused battery cable included
- Square or round bezel options suit different panel layouts
Specifications
| Brand | VICTRON ENERGY |
|---|---|
| Color | Transparent |
Questions about this item
How do I install the BMV-712 shunt and what is the step people often get wrong?
Connect all electrical leads to the quick-connect PCB on the shunt, then link the shunt to the monitor with the supplied RJ12 cable; the common mistake is skipping the fuse on the 2 m battery cable.
What maintenance or replacement will the BMV-712 need over time?
The unit itself has no user-serviceable parts; only the 2 m fused battery cable or 10 m RJ12 cable would need replacement if damaged.
What limit appears first on the BMV-712 during sustained monitoring?
Midpoint-voltage monitoring flags a single bad cell or battery in a series string before total bank capacity is affected.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.



