Value Brand
Value Brand Electric Sequencer 1 Switch 1-25 Sec
Controls HVAC and refrigeration systems with a single switch adjustable from 1 to 25 seconds off-delay
- Adjustable timing from 1 to 25 seconds for flexible control
- Handles up to 10 amps at 120V AC for reliable switching
- Supports 7 amps at 240V AC for higher voltage systems
- Manages 72 amp locked rotor current at 120V AC for motor starts
- Operates in horizontal or vertical orientation for versatile installation
Application and purpose
This electric sequencer controls the staged start-up of HVAC and refrigeration systems. It provides a single switching stage with an adjustable off-delay between one and 25 seconds. Installers use it to prevent compressor short-cycling and reduce inrush current on residential or light-commercial equipment.
Timing range
The auxiliary switch off-delay adjusts from one second minimum to 25 seconds maximum, while the on-delay spans 65 to 115 seconds. Selecting the correct off-delay within this window determines whether the sequencer matches the equipment manufacturer's required delay specification.
Electrical capacity
Rated for 10 amps full-load at 120 volts AC and seven amps at 240 volts AC, with locked-rotor ratings of 72 and 42 amps respectively. It comfortably handles typical single-phase compressor and fan motors but is not sized for larger three-phase loads or higher current applications.
Highlights
- Adjustable timing from 1 to 25 seconds for flexible control
- Handles up to 10 amps at 120V AC for reliable switching
- Supports 7 amps at 240V AC for higher voltage systems
- Manages 72 amp locked rotor current at 120V AC for motor starts
- Operates in horizontal or vertical orientation for versatile installation
Specifications
| Brand | ZORO SELECT |
|---|
Questions about this item
What does the 1-25 second off-time range mean for my HVAC system?
The auxiliary switch can delay its off cycle anywhere from 1 second up to 25 seconds, letting you stagger compressor or fan shutdown.
How do the 120 V and 240 V ratings limit the loads I can connect?
At 120 V the sequencer handles 10 A full-load and 72 A locked-rotor; at 240 V it handles 7 A full-load and 42 A locked-rotor.
Can I mount this sequencer vertically or must it be horizontal?
The unit is approved for both horizontal and vertical installation orientations.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.



