We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

Value Brand

Value Brand 700-504 HVAC Control

SKU CH-A74T-KDPFB

Combination gas valve for furnaces handles natural gas and liquid propane up to 240,000 BtuH with built-in pressure regulator and thermostat

  • Handles up to 240,000 BtuH heating capacity
  • Operates from -40 to 175 degrees F
  • Works with natural gas and liquid propane
  • Includes built-in pressure regulator and thermostat
  • Straight-thru flow design for furnace applications

Product identity

The Value Brand 700-504 is a combination gas valve built for furnace installations. It handles liquid propane, liquid propane/air mixtures and natural gas in a straight-thru flow configuration.

Thermal and pressure range

The valve operates continuously between -40 degrees F and 175 degrees F. A mechanical thermostat and a pressure regulator are included in the assembly for direct control of gas delivery.

Sustained heating capacity

Maximum heating output is rated at 240 000 BtuH for prolonged furnace cycles. Pilot and main port connections use 1/4 in and 1/2 in to 3/4 in sizes respectively for standard piping.

Highlights

  • Handles up to 240,000 BtuH heating capacity
  • Operates from -40 to 175 degrees F
  • Works with natural gas and liquid propane
  • Includes built-in pressure regulator and thermostat
  • Straight-thru flow design for furnace applications

Specifications

BrandROBERTSHAW

Questions about this item

How do I install the 700-504 gas valve and what step is commonly missed?

Connect the 1/2 in or 3/4 in ports for straight-thru flow and the 1/4 in pilot port; the step often missed is verifying the pressure regulator is set for the specific gas type before lighting the pilot.

What maintenance or replacement will the 700-504 valve need over time?

The mechanical thermostat and pressure regulator are the primary wear items; plan to inspect the pilot assembly and regulator diaphragm annually and replace the complete valve if the thermostat fails to hold calibration.

What is the first limit reached during sustained high-fire operation?

The 240,000 BtuH heating capacity ceiling is reached before the 175 °F maximum operating temperature under continuous full-load firing.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.