We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

Tripp Lite

Tripp Lite PDUMNH30HVAT 5.8 kW Monitored ATS PDU 1U 200-240V 30A 2x L6-30P 1x L6-30R

SKU CH-8H4E-CCV2B MPN PDUMNH30HVAT

A 1U monitored PDU with automatic transfer switching between two 30 A L6-30P inputs and a single L6-30R outlet, delivering up to 5.8 kW at 200–240 V with Ethernet remote access

  • TypeMonitored; Auto-Transfer Switch
  • Rack Size1U
  • StyleRackmount
  • Front Panel LEDsFront panel LEDs confirm amp (A) / kilowatt (kW) / voltage (
  • CertificationsTested to UL/CSA 60950-1 (USA, Canada), FCC Class A (Emissio
  • ROHSYes
  • Monitored 5.8 kW load via digital LED display
  • Automatic transfer switching within 1 to 5 minutes
  • Dual L6-30P inputs with 10-foot cords for redundancy
  • Ethernet interface enables remote monitoring and control
  • Tested to UL/CSA 60950-1 and FCC Class A standards

Single-Outlet Monitored ATS PDU

This 1U rack-mount power distribution unit provides monitored automatic transfer switching between two NEMA L6-30P inputs feeding a single L6-30R outlet. It delivers up to 5.8 kW at 200-240V and includes an Ethernet interface for remote monitoring of voltage, current, power, frequency and power factor.

Ideal for single-device or 0U PDU redundancy

Suits environments that need uninterrupted power for one critical load or a downstream vertical PDU with dual 30A 200-240V sources. Not suited for installations needing multiple output receptacles, different input connectors, or monitored switching across several outlets.

5.8 kW single L6-30R outlet

The sole output is one NEMA L6-30R receptacle rated for the full 5.8 kW capacity, so the buyer must confirm that the protected equipment or downstream PDU matches this single-connector, 30A 200-240V requirement.

Highlights

  • Monitored 5.8 kW load via digital LED display
  • Automatic transfer switching within 1 to 5 minutes
  • Dual L6-30P inputs with 10-foot cords for redundancy
  • Ethernet interface enables remote monitoring and control
  • Tested to UL/CSA 60950-1 and FCC Class A standards

Specifications

BrandTripp Lite
ModelPDUMNH30HVAT
TypeMonitored; Auto-Transfer Switch
Rack Size1U
StyleRackmount
Front Panel LEDsFront panel LEDs confirm amp (A) / kilowatt (kW) / voltage (V) / frequency (Hz) and power factor (PF) reporting information; Additional set of LEDs indicate Source A and Source B inputs for preferred, available and in-use status
CertificationsTested to UL/CSA 60950-1 (USA, Canada), FCC Class A (Emissions), NOM (Mexico)
ROHSYes
Input Voltage200 - 240V
Maximum Input Current30A
Input Connector(s)Two NEMA L6-30P input power cables
Cord Length10 Feet
Output Voltage240V, 230V, 220V, 208V, 200V
Output Frequency50/60Hz
Output Connector(s)1 x L6-30R
Operating Environment0 - 50 degree C
Operating Relative Humidity5 - 95%
Operating Elevation0 - 3048 m
Storage Temperature-15 - 60 degree C
FeaturesTwo single-phase L6-30P inputs with 10 Feet cords
L6-30R outlet for connecting single device or 0U vertical PDU
Automatic transfer switching within 1 - 5 minutes
Ethernet network interface for remote access
Digital LED display for real-time status monitoring
Dimensions1.72" x 16.93" x 14.00"
Weight15.37 lbs.
Shipping weight8.17 kg
Package size555 × 526 × 190 mm

Questions about this item

How much rack depth do the two 10-foot L6-30P input cords need behind a 1U mounting space?

Each cord is 10 feet long; allow enough rear clearance to route both L6-30P plugs without sharp bends so the 1U chassis sits flush in the rack.

Which step do installers often miss when wiring the dual L6-30P inputs for automatic transfer switching?

Connect both L6-30P plugs to separate 200-240V 30A circuits, then verify the front-panel LEDs show Source A and Source B as available before enabling the 1-5 minute transfer timer.

What ongoing checks does the front-panel LED display require to confirm the 5.8 kW load stays within limits?

Monitor the real-time amp, kilowatt, voltage, frequency and power-factor readings on the digital LEDs; investigate if current approaches the 30A rating or power factor drifts.

New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.