M.A. Ford
M.A. Ford Cyclone Xd 5X Coolant Fed Double Margin Drill 23/64
Coolant-fed double-margin drill with five-times diameter capacity, 23/64 size
- Coolant-fed design clears chips efficiently during deep drilling
- Double-margin construction improves hole accuracy and tool stability
- 5× diameter reach extends capability in deep-hole applications
- 23/64 inch diameter suits precise fractional-size requirements
- Cyclone Xd geometry enhances cutting performance in tough materials
Cyclone Xd 5X drill for precision holes
The Cyclone Xd 5X is a coolant-fed double-margin drill built for accurate 23/64 inch holes. It targets machinists and maintenance teams who need consistent chip evacuation and tight tolerance in production or repair work.
Double margin design and coolant feed
Two margins guide the drill to reduce wandering and improve surface finish. Internal coolant passages deliver fluid to the cutting zone, extending tool life and helping manage heat during deep or repeated drilling cycles.
Check shank fit and coolant supply
Verify that your holder accepts the drill shank and that your machine can route coolant through the tool. The product carries a California Proposition 65 notice for chemicals linked to cancer and reproductive harm, so review safety data before use.
Highlights
- Coolant-fed design clears chips efficiently during deep drilling
- Double-margin construction improves hole accuracy and tool stability
- 5× diameter reach extends capability in deep-hole applications
- 23/64 inch diameter suits precise fractional-size requirements
- Cyclone Xd geometry enhances cutting performance in tough materials
Specifications
| Brand | M.A. FORD |
|---|
Questions about this item
What does the 5X in Cyclone Xd 5X mean for drilling depth?
The 5X designation indicates this drill can reach a depth of five times its 23/64 inch diameter in a single pass
What shank style does the CXDCR3594AP use for tool-holder fit?
It has a straight cylindrical shank sized to match the 23/64 inch cutting diameter for direct collet or holder clamping
How is coolant delivered through this double-margin drill during installation?
Coolant exits through internal holes that run the full flute length, so the feed must be started before spindle rotation to avoid dry cutting
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.



