Zoro Select M50302.260.0032 Sealing Washer M26 Copper 10 Pack
- Washers
We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.
HNZXIB
Stainless-steam distillation system with a 30 L extraction tank, 6 kW oil-bath heating to 100 °C and glass oil-water separator for plant essential oils
The HNZXIB extractor processes up to 30 litres of plant material per batch using steam distillation. It is built from SUS304 stainless steel and boride glass for laboratory-grade purity. The unit runs on 110V power with a 6kW electric heating system that brings heat-transfer oil to 100°C at normal pressure. One operator can manage the full cycle from loading to oil collection.
Indirect heating through heat-transfer oil reaches 100°C quickly while keeping the vessel at normal pressure. The extraction tank provides 0.33 cubic metre of heating area and the condenser offers 0.72 cubic metre of condensing area for efficient vapour recovery. Electric heating draws 6kW total. Interlayer pressure is rated at 0.3-0.4Mpa with an optional vacuum capability to -0.08Mpa.
A laboratory-grade glass multi-pipe condenser and a dedicated boride glass oil-water separator simplify the collection of essential oil from the cooled azeotrope. The built-in layered distillation basket features an open-top design for easy loading of flowers, grasses or animal materials and straightforward cleaning. A two-stage filtration device and glass liquid-level indicator complete the integrated workflow.
| Voltage | 110V |
|---|
Place the unit on a level surface, connect to 110V power, fill the heat-conducting oil jacket, load plant material into the open-top distillation basket, then start the automatic control system; the step often missed is verifying the interlayer pressure stays within 0.3-0.4Mpa before beginning distillation.
Clean the boride glass condenser tubes and oil-water separator after each run, inspect the SUS304 stainless steel seals and the two-stage filtration device regularly, and replace the heat-conducting oil periodically to maintain the 100°C heating capability.
The 6KW electric heating power and 0.33 cubic meter heating area set the maximum steam generation rate, while the 0.72 cubic meter condenser area limits continuous vapour handling, so the condensation capacity typically becomes the bottleneck first.
Also in this aisle
Same shelf, same checkout — eight coins and a 30-minute rate lock.
What you pay in, and what you read prices in.
Sent from your wallet at checkout
Display only — the catalogue is priced in USD
No currency matches that.
Pick the language the site speaks to you in.
No language matches that.
New here?
Already have one?
There is no automatic reset: this shop sends no mail, so there is no one-time link to ask for. Leave the address on the account and it gets picked up by hand.
Request noted
Nothing is on its way to your inbox — this shop sends no mail at all. Someone picks these up by hand.
Remembered it?