We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

Ennovor

Ennovor 7.5 Inch Mount Head Cable Ties 100 Pack 50 LBS UV Black

SKU CH-VRRF-EVM35

Self-locking nylon 66 cable ties with 5 mm mounting holes, 50 lbs tensile strength, UV resistant, 100 pack

  • Accessory TypeTies
  • Secure mounting with integrated 5 mm screw hole
  • 50 lbs tensile strength holds heavy bundles
  • UV-resistant nylon 66 rated UL 94v-2 for outdoor use
  • Self-locking teeth grip cables tightly without slipping
  • 100 pieces in a poly bag with hang hole

Cable Management Ties

These 100-piece packs of 7.5 inch nylon 66 zip ties serve installers, engineers and hobbyists who need secure mounting points for wire bundles. Each strap features an integrated eyelet that accepts a number 5 screw for permanent attachment to panels or frames. The self-locking teeth engage reliably and the material carries a UL 94v-2 flame rating. UV-resistant black colouring makes them suitable for outdoor as well as indoor routing tasks.

Capacity and Headroom

Rated at 50 lbs tensile strength, the ties comfortably secure typical cable looms up to a 3.54 inch maximum bundle diameter. The 4.8 mm strap width distributes clamping force without cutting into insulation. They run out of grip when bundles exceed the stated diameter or when loads surpass the 50 lb limit, so heavier trunking or conduit requires a stronger fastening method.

Practical Mounting Limits

The 5 mm mounting hole fits standard M5 hardware but will not accept larger bolts or anchors without drilling. Nylon 66 resists weathering and UV exposure, yet prolonged extreme heat or chemical contact can degrade the material over time. The self-locking mechanism is not releasable, so any adjustment demands cutting the strap and replacing it with a fresh tie.

Highlights

  • Secure mounting with integrated 5 mm screw hole
  • 50 lbs tensile strength holds heavy bundles
  • UV-resistant nylon 66 rated UL 94v-2 for outdoor use
  • Self-locking teeth grip cables tightly without slipping
  • 100 pieces in a poly bag with hang hole

Specifications

Accessory TypeTies

Questions about this item

Will the 5 mm screw holes on these 7.5 inch ties line up with the existing cable clips on my older rack?

Each tie has a 5 mm mounting hole in the head so you can fasten it to any panel or clip that accepts a 5 mm screw.

How can I verify the self-locking teeth are holding at the rated 50 lbs after installation?

Pull the bundle firmly; the nylon 66 strap will not slip because the pawl engages the serrations and the UL 94V-2 material resists creep under load.

Does the 100-piece poly bag include mounting screws or do I need to supply my own?

The bag contains only the 100 nylon 66 ties; screws for the 5 mm holes are not included and must be purchased separately.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.