APC
APC APDU10250SM PDU Switched Metered 3Phase 11kW 400V 16A 11.5kW 415V 20A 48 Outlets IEC309
Switched and metered three-phase PDU delivering 11 kW at 400 V 16 A or 11.5 kW at 415 V 20 A with 48 IEC309 outlets
- TypePDUs & Line Conditioners
- Switched metered outlets enable remote power cycling per socket
- 48 IEC outlets support dense rack deployments with a single unit
- Three-phase input delivers 11 kW at 400 V 16 A or 11.5 kW at 415 V 20 A
- IEC 309 plug ensures secure industrial-grade connection
- TAA, UKCA and BAA compliance meets government procurement requirements
Three-Phase Power Distribution
The APC APDU10250SM is a switched and metered rack PDU built for three-phase environments. It suits data-centre managers who need outlet-level control and real-time power monitoring across a full cabinet. The unit delivers up to 11 kW at 400 V or 11.5 kW at 415 V.
48 IEC309 Outlets and Current Limits
Forty-eight IEC309 outlets provide high-density connectivity for servers and networking gear. Each phase is rated for 16 A at 400 V and 20 A at 415 V, so total load must stay within those per-phase limits. Outlet switching allows remote reboot of individual devices without visiting the rack.
TAA UKCA BAA Compliance
The PDU meets TAA, UKCA and BAA requirements, making it eligible for government and regulated-sector procurements. Buyers who do not need those certifications can still use the unit, but the compliance marks are the deciding factor for qualified tenders.
Highlights
- Switched metered outlets enable remote power cycling per socket
- 48 IEC outlets support dense rack deployments with a single unit
- Three-phase input delivers 11 kW at 400 V 16 A or 11.5 kW at 415 V 20 A
- IEC 309 plug ensures secure industrial-grade connection
- TAA, UKCA and BAA compliance meets government procurement requirements
Specifications
| Brand | APC |
|---|---|
| Type | PDUs & Line Conditioners |
| Shipping weight | 9.70 kg |
| Package size | 1720 × 208 × 116 mm |
Questions about this item
Should I select the 11 kW 400 V 16 A rating or the 11.5 kW 415 V 20 A rating?
Choose the 11 kW 400 V 16 A rating for standard 400 V three-phase supplies; choose the 11.5 kW 415 V 20 A rating where the facility provides 415 V three-phase power.
What does the 11 kW or 11.5 kW headline power mean once the unit is installed?
It is the maximum continuous three-phase load the PDU can distribute across its 48 outlets without exceeding the 16 A or 20 A per-phase input limit.
What does the IEC 309 input cap in practice?
The IEC 309 plug limits the connection to a 16 A or 20 A three-phase supply, fixing the maximum usable power at 11 kW or 11.5 kW respectively.
New to this? Which coin should you pay with — what to check, what it costs to pay, and what is never asked for.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.



