Akko V3 Fairy Linear Silent Switch 50gf 45pcs
Set of 45 pre-lubed linear silent switches with 50gf actuation and MX-compatible stems
- Materialpolyamide
- Keyboard InterfaceUSB
- Palm RestContemporary, USB Cable
- Function Keys1
- Mechanical KeyboardTactile
- Key SwitchTactile
- Quieter typing with 50gf silent linear switches
- Smooth keystrokes from factory pre-lubed rails
- Fits most keycaps via standard MX stem
- LED slot ready for SMD or through-hole lighting
- 50 million keystroke lifespan in 45-switch pack
Quiet Linear Switches for Hot-Swap Boards
Akko V3 Fairy switches are 5-pin linear silencers rated at 50gf operating force. They arrive pre-lubed for smooth travel and fit most hot-swappable mechanical keyboards with MX-style sockets. The pack contains 45 switches and a storage tray.
Pre-Lubed Rails and LED Slot
Factory lubrication on the stem rails reduces friction and acoustic signature straight from the tray. Each housing includes an integrated LED slot compatible with SMD LEDs mounted beneath the switch, allowing per-key lighting without additional PCB work.
Polyamide Housing with MX Cross Stem
The polyamide bodies use a standard MX cross stem so aftermarket keycap sets install without adapters. Switches are rated for approximately 50 million keystrokes in laboratory testing. Optical keyboards and solder-only PCBs are not supported.
Highlights
- Quieter typing with 50gf silent linear switches
- Smooth keystrokes from factory pre-lubed rails
- Fits most keycaps via standard MX stem
- LED slot ready for SMD or through-hole lighting
- 50 million keystroke lifespan in 45-switch pack
Specifications
| Brand | Akko |
|---|---|
| Part Number | Akko |
| Material | polyamide |
| Keyboard Interface | USB |
| Palm Rest | Contemporary, USB Cable |
| Function Keys | 1 |
| Mechanical Keyboard | Tactile |
| Key Switch | Tactile |
| Key Switch Type | Tactile |
| Keyboard Color | Fairy |
| Backlit | Built-in LED Slot, MX Style Compatibility |
| Dimensions | 10 cm x 5 cm x 1.27 cm |
| Mouse Included | Contemporary |
| Mouse DPI | Gaming |
| Hand Orientation | Ambidextrous |
| Mouse Grip Style | Built-in LED Slot, MX Style Compatibility |
| Mouse Adjustable Weight | Built-in LED Slot, MX Style Compatibility |
| Buttons | 4 |
| Mouse Color | Fairy |
| Power Source | Wired |
| Operating Time | Wired, false |
| Operating System Supported | PC |
| System Requirement | USB Cable |
| Features | Built-in LED Slot, MX Style Compatibility, polyamide, Ambidextrous |
| Package Contents | USB Cable |
Questions about this item
How many keystrokes can each Akko V3 Fairy Linear Silent Switch handle before it may need replacing?
Each switch is rated for approximately 50 million keystrokes in laboratory durability tests.
What force limit defines the actuation point of these 50gf linear switches during sustained typing?
The operating force is specified at 50gf ± 5gf, so the actuation point stays within that narrow band.
How much noise and heat do the pre-lubed 5-pin switches generate when used all day?
Factory lubrication on the rails and the silent linear design reduce operating noise, while the polyamide housing dissipates minimal heat during continuous use.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.
Lenovo 42T3273 Black Replacement Keyboard for ThinkPad T60 T61
- Thinkpad T60 T61 Ke…
- Black



