We take cryptocurrency — so the coins you hold can buy real hardware.Pay in crypto, spend it on real hardware. Free insured shipping worldwide over $399. Plain, unbranded boxes, sent from Germany.Free insured shipping over $399. Your rate is locked for 30 minutes once checkout opens.Rate locked 30 minutes. Every item sealed, serial-checked and covered by a 24-month warranty.Sealed, 24-month warranty.

Saved items Sign in

Value Brand

Value Brand PVC Reducing Wye Hub 2 in x 2 in x 1 1/2 in Schedule 40

SKU CH-MGFZ-90VWQ

A PVC Schedule 40 reducing wye with hub connections for 2 in to 1 1/2 in pipe transitions

  • Schedule 40 PVC meets ASTM D-1784 standards
  • Cell class 12454 material resists corrosion
  • Hub connection simplifies pipe joining
  • Reducing wye directs flow to smaller branch
  • White PVC suits standard plumbing installations

PVC Reducing Wye Hub

This PVC reducing wye hub connects three pipe sections in a drainage or vent system. The hub ends accept solvent-weld joints for a permanent, leak-resistant seal. It suits residential and light-commercial plumbing installations.

Thermals noise and power draw

As a passive fitting it generates no heat, produces no noise and draws no power. The Schedule 40 wall thickness handles normal drainage pressures without deformation. PVC construction resists corrosion from common household chemicals.

Deciding specification

The 2 in x 2 in x 1 1/2 in hub configuration determines whether this wye matches your pipe layout. Verify the three diameters against your system before purchase. Cell Class 12454 and ASTM D-1784 confirm the material grade.

Highlights

  • Schedule 40 PVC meets ASTM D-1784 standards
  • Cell class 12454 material resists corrosion
  • Hub connection simplifies pipe joining
  • Reducing wye directs flow to smaller branch
  • White PVC suits standard plumbing installations

Specifications

BrandZORO SELECT

Questions about this item

How do you solvent-weld this reducing wye and what step causes leaks?

Prime and cement each hub, fully seat the pipes, and hold the joint for the recommended set time; the most common error is inserting the pipe without a full quarter-turn to spread the cement evenly.

What maintenance or replacement will this Schedule 40 PVC wye need over time?

The fitting itself requires no routine maintenance; inspect joints periodically for stress cracks or leakage and replace the wye only if physical damage or chemical attack occurs.

What limit appears first when this wye handles continuous flow?

The Schedule 40 wall thickness and ASTM D-1784 Cell Class 12454 material define the maximum working pressure; sustained pressure above that rating will cause failure before any other factor.

Also in this aisle

People compared these

Same shelf, same checkout — eight coins and a 30-minute rate lock.