Tundra
Tundra CM1012 Inverter Installation Kit 12 ft Cable 100A Fuse 4 AWG
Includes two 12 ft 4 AWG cables with a 100A CNL fuse, holder, hardware, loom and strain relief for compatible inverter models
- TypeTraffic & Parking Lot
- Complete inverter setup with 12 ft cables included
- 100A CNL fuse protects against overcurrent damage
- 4 AWG wire handles high current loads safely
- Compatible with IBC4024, IBC80, M1000, S600 models
- Includes fuse holder, hardware, loom and strain relief
Kit contents
This Tundra CM1012 kit provides the cables, a 100 A CNL fuse with holder, loom, strain relief and hardware needed to install a compatible inverter. Two 12 ft lengths of 4 AWG cable are included for the power run.
Who this suits
Installers fitting an IBC4024, IBC80, M1000 or S600 inverter, or matching Grainger models 45MR75, 45MR83, 45MR92 and 45MR94, will find the correct fuse rating and cable gauge in one package. Buyers using a different inverter or requiring a longer cable run should look elsewhere.
Sustained-load behaviour
The 4 AWG conductors and 100 A fuse are sized for continuous current up to the fuse rating, so voltage drop remains stable during extended inverter operation. The supplied strain relief and loom protect the cables from vibration and heat over long periods.
Highlights
- Complete inverter setup with 12 ft cables included
- 100A CNL fuse protects against overcurrent damage
- 4 AWG wire handles high current loads safely
- Compatible with IBC4024, IBC80, M1000, S600 models
- Includes fuse holder, hardware, loom and strain relief
Specifications
| Brand | TUNDRA |
|---|---|
| Type | Traffic & Parking Lot |
Questions about this item
Which inverter models does the CM1012 kit support?
The kit is compatible with manufacturer models IBC4024, IBC80, M1000, and S600, as well as Grainger models 45MR75, 45MR83, 45MR92, and 45MR94.
Will the included 100A CNL fuse protect my existing 4 AWG wiring?
Yes, the 100A CNL fuse and fuse holder are sized for the supplied 4 AWG cables, providing over-current protection for that wire gauge.
How can I verify the kit is correctly installed and functional?
After securing the fuse holder, routing both 12 ft cables through the loom, and tightening the strain relief, power the inverter and confirm it starts without the fuse blowing.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.



