M.A. Ford
M.A. Ford Cyclone Xd 8X Coolant Fed Double Margin Drill 9.20 mm
Coolant-fed double-margin drill in 9.20 mm diameter for deep-hole precision
- Coolant-fed design clears chips efficiently during deep drilling
- Double margin construction improves hole accuracy and surface finish
- 8x diameter capability reaches 9.20 mm depth in one pass
- M.A. Ford engineering delivers consistent performance in tough materials
- California Proposition 65 warning applies to this product
Cyclone Xd 8X coolant-fed drill
The M.A. Ford Cyclone Xd is a coolant-fed double-margin drill built for high-efficiency holemaking in demanding materials. It targets machinists and production engineers who need consistent performance on CNC equipment.
Internal coolant delivery manages heat
Coolant fed through the tool body directs fluid to the cutting zone, reducing thermal load on the margins and the workpiece. This helps maintain dimensional stability and extends tool life during deep or continuous drilling cycles.
Double margin design improves guidance
Two margins provide better hole straightness and surface finish compared with single-margin drills. The 9.20 mm diameter suits applications requiring this specific size, while the Prop 65 notice indicates the presence of listed chemicals requiring workplace awareness.
Highlights
- Coolant-fed design clears chips efficiently during deep drilling
- Double margin construction improves hole accuracy and surface finish
- 8x diameter capability reaches 9.20 mm depth in one pass
- M.A. Ford engineering delivers consistent performance in tough materials
- California Proposition 65 warning applies to this product
Specifications
| Brand | M.A. FORD |
|---|
Questions about this item
How do I install the 9.20 mm Cyclone Xd drill in a coolant-fed holder, and what step is often missed?
Mount the shank securely in a compatible coolant-fed holder, align the double margins, then activate through-spindle coolant before starting the spindle; the step most often missed is confirming coolant flow reaches the drill tip before cutting begins.
What maintenance or replacement will the 9.20 mm Cyclone Xd drill need during its service life?
The cutting edges will dull with use and require professional regrinding to restore geometry; coolant passages should be flushed regularly to prevent blockage, and the drill must be replaced once the diameter wears below tolerance or the margins show excessive wear.
What limit appears first on the 9.20 mm Cyclone Xd drill during sustained high-feed drilling?
The double-margin design improves stability, but sustained heavy feeds will generate heat at the margins first, leading to margin wear and potential workpiece overheating before the cutting edges fail.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.



