M.A. Ford
M.A. Ford CDACR2812 Cyclone Drill Aluminum 5X 2 Flute Coolant Fed
Cyclone drill for aluminium with five-times diameter reach, two flutes and coolant feed
- Optimised for aluminium machining with Cyclone geometry
- 5x diameter reach enables deep-hole drilling
- Two-flute design improves chip evacuation in soft alloys
- Internal coolant feed extends tool life and finish
- M.A. Ford engineering backs reliable performance
Aluminium-specific 5×D drill
The M.A. Ford CDACR2812 Cyclone Drill is engineered for aluminium workpieces. Its two-flute geometry and coolant-fed design evacuate chips efficiently in soft, gummy material. Machinists and fabricators who run dedicated aluminium jobs gain consistent hole quality without manual peck cycles.
Coolant-through thermal control
Internal coolant passages direct fluid to the cutting zone, suppressing heat build-up during deep-hole drilling. The 5× diameter length increases dwell time, so steady coolant flow prevents built-up edge and extends tool life. Operators experience quieter cuts and reduced spindle load compared with external flood cooling alone.
5× diameter reach decides fit
The 2812 model provides a 5× diameter drilling depth in a single pass. Shops needing deeper holes without tool changes will find this length suitable; those restricted by shorter machine envelopes or requiring longer reach must select a different specification.
Highlights
- Optimised for aluminium machining with Cyclone geometry
- 5x diameter reach enables deep-hole drilling
- Two-flute design improves chip evacuation in soft alloys
- Internal coolant feed extends tool life and finish
- M.A. Ford engineering backs reliable performance
Specifications
| Brand | M.A. FORD |
|---|
Questions about this item
How is the M.A. Ford CDACR2812 Cyclone Drill installed in a CNC machine, and what coolant setup step is often missed?
Secure the shank in a precision holder, then connect coolant lines to the through-tool ports; operators often forget to verify flow rate before starting the 5X drilling cycle.
What maintenance or replacement will the 2-flute carbide drill need after extended use in aluminum?
The cutting edges will dull first; plan to resharpen or replace the drill once flank wear reaches the wear land limit for the CDACR2812 geometry.
What limit appears first during sustained high-speed drilling with coolant feed?
Thermal buildup at the drill point typically becomes the limiting factor before flute clogging or holder runout in continuous 5X operations.
Also in this aisle
People compared these
Same shelf, same checkout — eight coins and a 30-minute rate lock.



